Application Reduction of asphaltenes and paraffin, production increase.
Well Description
Project This well was experiencing asphaltene and paraffin deposition problems. A microbial treatment plan was developed and initiated to improve operations.
Method The well was treated three times with a 75% Para-Bac/S and 25% Ben-Bac mixture down the annulus.
Results Overall, this well showed a 55% decrease in asphaltenes and a 121% increase in produced oil.
| Date | Pour-Point | Asphaltenes | Paraffin |
|---|---|---|---|
| 7/7 pre-treatment | 39 | 6.58 | 17.1 |
| 7/26 first treatment | 38 | 6.07 | 18.18 |
| 8/11 | 38 | 4.2 | 20.1 |
| 8/30 | 37 | 2.95 | 14.1 |
| Monthly Production Charges | |||
|---|---|---|---|
| Date | Liquid (tons/day) | Oil (tons/day) | Water cut |
| Pre-treatment | 7.7 | 5.3 | 31.1% |
| Treatment | |||
| July | 9.7 | 5.82 | 40% |
| August | 8.3 | 5.2 | 37% |
| September | 14.4 | 8.4 | 41.6% |
| October | 19.2 | 11.7 | 39% |